Assessment Year | 1988 |
---|---|
Principal Product | HEALTH & BEAUTY AIDS |
NAICS |
n/a
|
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,944 | 2,645,955 |
kWh
|
$0.048 |
Natural Gas | $55,558 | 12,492 |
MMBtu
|
$4.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $5,526 | $7,320 | - |
$5,526
-
MMBtu
|
- | |
02 | 2.7123: Keep lamps and reflectors clean | $7,118 | $15,836 |
$7,118
148,300
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,699 | $1,110 |
$4,699
97,890
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $914 | - | - |
$1,214
-
MMBtu
|
$(-300.0) | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,252 | - |
$1,252
26,084
kWh
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $233 | $310 | - |
$233
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $732 | - |
$732
15,240
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,872 | $600 |
$2,872
59,789
kWh
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $464 | $355 |
$464
9,672
kWh
|
- | - | |
11 | 2.2122: Install / repair insulation on condensate lines | $123 | $50 | - |
$123
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $23,933 | $25,581 |
$17,137
356,975
kWh
|
$7,096
-
MMBtu
|
$(-300.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs