ITAC Assessment: TN0328
ITAC logo
ITAC Assessment: TN0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CARBON FIBERS
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 63
Plant Area
n/a
Annual Production 300,000
lb
Production Hrs. Annual 3,213
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,230 4,490,328
kWh
Natural Gas $60,736 13,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $18,715 $40,300 $18,715
304,220
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,135 - $4,135
67,116
kWh
-
03 2.6232: Install set-back timers $1,617 - $1,617
26,084
kWh
-
04 2.2135: Repair and eliminate steam leaks $400 $150 - $400
-
MMBtu
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,244 $4,554 $1,244
20,223
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $916 $590 $916
14,947
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $563 $90 $563
9,086
kWh
-
TOTAL RECOMMENDED $27,590 $45,684 $27,190
441,676
kWh
$400
-
MMBtu
TOTAL IMPLEMENTED $26,346 $41,130 $25,946
421,453
kWh
$400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs