Assessment Year | 1987 |
---|---|
Principal Product | CARBON FIBERS |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 63 |
Plant Area |
n/a
|
Annual Production | 300,000
lb
|
Production Hrs. Annual | 3,213
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,230 | 4,490,328 |
kWh
|
$0.062 |
Natural Gas | $60,736 | 13,199 |
MMBtu
|
$4.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,590 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,346 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $18,715 | $40,300 |
$18,715
304,220
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,135 | - |
$4,135
67,116
kWh
|
- | |
03 | 2.6232: Install set-back timers | $1,617 | - |
$1,617
26,084
kWh
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $400 | $150 | - |
$400
-
MMBtu
|
|
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,244 | $4,554 |
$1,244
20,223
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $916 | $590 |
$916
14,947
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $563 | $90 |
$563
9,086
kWh
|
- | |
TOTAL RECOMMENDED | $27,590 | $45,684 |
$27,190
441,676
kWh
|
$400
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,346 | $41,130 |
$25,946
421,453
kWh
|
$400
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs