ITAC Assessment: DS0102
ITAC logo
ITAC Assessment: DS0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Construction and Maintenance Vehicles
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 54,000
ft2
Annual Production 180
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,672 699,297
kWh
Electricity Demand $17,628 2,328
kW-mo/yr
Electricity Fees $1,665 -
Natural Gas $12,712 3,611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,172

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,348 $4,800 $1,232
39,859
kWh
$1,116
-
kW-mo/yr
- - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $602 $180 $284
9,086
kWh
$318
-
kW-mo/yr
- - - - - -
03 2.3212: Optimize plant power factor $438 $985 - - $438 - - - - -
04 3.1192: Reduce scrap production $3,270 $172 - - - - $3,270
-
lb
- - -
05 3.4115: Recover and reuse cooling water $875 $1,023 - - - $476
-
Tgal
- - - $399
-
Tgal
06 4.711: Initiate a total quality management program $4,588 $3,000 - - - - - - $4,588 -
07 2.6124: Establish equipment maintenance schedule $952 $1,695 - - - - - $952 - -
TOTAL RECOMMENDED $13,073 $11,855 $1,516
48,945
kWh
$1,434
-
kW-mo/yr
$438 $476
-
Tgal
$3,270
-
lb
$952 $4,588 $399
-
Tgal
TOTAL IMPLEMENTED $7,172 $6,847 $1,516
48,945
kWh
$1,434
-
kW-mo/yr
- - $3,270
-
lb
$952 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs