ITAC Assessment: TN0322
ITAC logo
ITAC Assessment: TN0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CARBONATED BEVERAGES
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 9,000,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,440 2,759,086
kWh
Natural Gas $87,535 18,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $806 $1,500 - $806
-
MMBtu
02 2.7261: Install timers and/or thermostats $9,054 $6,400 - $9,054
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $2,634 $12,750 - $2,634
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $4,952 - $4,952
75,029
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,269 $1,125 $3,269
49,531
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $774 $40 $774
11,723
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $638 $735 $638
9,672
kWh
-
TOTAL RECOMMENDED $22,127 $22,550 $9,633
145,955
kWh
$12,494
-
MMBtu
TOTAL IMPLEMENTED $17,175 $22,550 $4,681
70,926
kWh
$12,494
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs