Assessment Year | 2011 |
---|---|
Principal Product | Filters |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
475,000
ft2
|
Annual Production | 5,200,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $280,627 | 4,088,560 |
kWh
|
$0.069 |
Natural Gas | $26,063 | 4,305 |
MMBtu
|
$6.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,403 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,438 | $510 |
$6,438
93,852
kWh
|
- | |
02 | 2.2437: Recover waste heat from equipment | $1,812 | $1,220 | - |
$1,812
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,613 | $2,745 |
$1,613
23,526
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $728 | $2,751 |
$728
10,612
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,469 | $55,540 |
$29,469
429,581
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,965 | $47,375 |
$12,965
189,000
kWh
|
- | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $5,011 | $23,400 |
$755
11,003
kWh
|
$4,256
-
MMBtu
|
|
08 | 2.2691: Shut off cooling if cold outside air will cool process | $2,546 | $12,837 |
$2,546
37,121
kWh
|
- | |
09 | 2.7241: Install outside air damper / economizer on hvac unit | $1,450 | $4,260 |
$1,450
21,141
kWh
|
- | |
10 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,371 | - |
$3,371
49,140
kWh
|
- | |
TOTAL RECOMMENDED | $65,403 | $150,638 |
$59,335
864,976
kWh
|
$6,068
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,820 | $23,910 |
$10,564
153,995
kWh
|
$4,256
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs