Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 80,000
ft2
Annual Production 16,500
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,630 703,986
kWh
Electricity Demand $37,164 3,614
kW-mo/yr
Electricity Fees $3,208 -
Natural Gas $19,340 2,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,544 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
01 3.5111: Filter and reuse hydraulic oil $8,867 $35,000 - - $8,867
-
gal
-
02 2.7241: Install outside air damper / economizer on hvac unit $5,746 $5,000 $5,746
89,390
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,447 $11,895 $3,559
55,100
kWh
$888
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $484 $1,287 - - - $484
-
gal
TOTAL RECOMMENDED $19,544 $53,182 $9,305
144,490
kWh
$888
-
kW-mo/yr
$8,867
-
gal
$484
-
gal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs