Assessment Year | 1996 |
---|---|
Principal Product | pumps |
NAICS |
n/a
|
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
80,000
ft2
|
Annual Production | 16,500
pieces
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,630 | 703,986 |
kWh
|
$0.059 |
Electricity Demand | $37,164 | 3,614 |
kW-mo/yr
|
$10.28 |
Electricity Fees | $3,208 | - |
|
- |
Natural Gas | $19,340 | 2,432 |
MMBtu
|
$7.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,544 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5111: Filter and reuse hydraulic oil | $8,867 | $35,000 | - | - |
$8,867
-
gal
|
- | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $5,746 | $5,000 |
$5,746
89,390
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,447 | $11,895 |
$3,559
55,100
kWh
|
$888
-
kW-mo/yr
|
- | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $484 | $1,287 | - | - | - |
$484
-
gal
|
|
TOTAL RECOMMENDED | $19,544 | $53,182 |
$9,305
144,490
kWh
|
$888
-
kW-mo/yr
|
$8,867
-
gal
|
$484
-
gal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs