ITAC Assessment: TN0314
ITAC logo
ITAC Assessment: TN0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INTERIOR TRIM PARTS(CAR)
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 19,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,098 8,707,210
kWh
Natural Gas $105,509 22,461
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $9,593 $4,040 - $9,593
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $3,581 $16,250 - $3,581
-
MMBtu
03 2.2511: Insulate bare equipment $7,234 $920 $7,234
141,852
kWh
-
04 2.6232: Install set-back timers $6,113 - $6,113
119,871
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,182 - $2,182
42,790
kWh
-
06 2.2511: Insulate bare equipment $1,839 $1,160 $1,839
36,049
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,779 $250 $1,779
34,877
kWh
-
TOTAL RECOMMENDED $32,321 $22,620 $19,147
375,439
kWh
$13,174
-
MMBtu
TOTAL IMPLEMENTED $16,792 $21,700 $3,618
70,926
kWh
$13,174
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs