ITAC Assessment: TN0311
ITAC logo
ITAC Assessment: TN0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CORR SHIPPING CONTAINERS
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 93
Plant Area
n/a
Annual Production 588,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,874 4,089,097
kWh
Natural Gas $95,596 18,250
MMBtu
Fuel Oil #2 $99,237 29,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7314: Reduce ventilation air $12,846 - $366
7,620
kWh
$12,480
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $5,954 $5,400 - $5,954
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $2,320 $190 - - $2,320
-
MMBtu
04 2.2163: Use minimum steam operating pressure $1,857 - - - $1,857
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $1,094 $437 - - $1,094
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $994 $300 - - $994
-
MMBtu
07 2.2111: Install steam trap $883 $1,900 - - $883
-
MMBtu
08 2.2122: Install / repair insulation on condensate lines $624 $68 - - $624
-
MMBtu
09 2.7446: Utilize sensors controlling roof and wall openings $822 $1,665 - $822
-
MMBtu
-
10 2.6212: Turn off equipment during breaks, reduce operating time $359 - - - $359
-
MMBtu
TOTAL RECOMMENDED $27,753 $9,960 $366
7,620
kWh
$19,256
-
MMBtu
$8,131
-
MMBtu
TOTAL IMPLEMENTED $23,832 $6,395 $366
7,620
kWh
$18,434
-
MMBtu
$5,032
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs