Assessment Year | 1987 |
---|---|
Principal Product | CORR SHIPPING CONTAINERS |
NAICS |
n/a
|
SIC | 2631: Paperboard Mills |
Sales Range | $10 M to 50M |
# of Employees | 93 |
Plant Area |
n/a
|
Annual Production | 588,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $194,874 | 4,089,097 |
kWh
|
$0.048 |
Natural Gas | $95,596 | 18,250 |
MMBtu
|
$5.24 |
Fuel Oil #2 | $99,237 | 29,862 |
MMBtu
|
$3.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,753 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,832 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $12,846 | - |
$366
7,620
kWh
|
$12,480
-
MMBtu
|
- | |
02 | 2.7261: Install timers and/or thermostats | $5,954 | $5,400 | - |
$5,954
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $2,320 | $190 | - | - |
$2,320
-
MMBtu
|
|
04 | 2.2163: Use minimum steam operating pressure | $1,857 | - | - | - |
$1,857
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $1,094 | $437 | - | - |
$1,094
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $994 | $300 | - | - |
$994
-
MMBtu
|
|
07 | 2.2111: Install steam trap | $883 | $1,900 | - | - |
$883
-
MMBtu
|
|
08 | 2.2122: Install / repair insulation on condensate lines | $624 | $68 | - | - |
$624
-
MMBtu
|
|
09 | 2.7446: Utilize sensors controlling roof and wall openings | $822 | $1,665 | - |
$822
-
MMBtu
|
- | |
10 | 2.6212: Turn off equipment during breaks, reduce operating time | $359 | - | - | - |
$359
-
MMBtu
|
|
TOTAL RECOMMENDED | $27,753 | $9,960 |
$366
7,620
kWh
|
$19,256
-
MMBtu
|
$8,131
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,832 | $6,395 |
$366
7,620
kWh
|
$18,434
-
MMBtu
|
$5,032
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs