ITAC Assessment: TN0308
ITAC logo
ITAC Assessment: TN0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ELECT. CONTROL DEVICES
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 276,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,408 4,454,279
kWh
Natural Gas $27,494 5,329
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $14,834 - $14,834
279,894
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,468 $16,872 $5,468
103,165
kWh
-
03 2.7262: Separate controls of air handlers from ac/ heating systems $2,858 $3,500 $2,858
53,927
kWh
-
04 2.2511: Insulate bare equipment $603 $1,440 - $603
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,709 $165 $1,709
32,239
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $950 $470 $950
17,878
kWh
-
07 2.3212: Optimize plant power factor $1,764 $6,800 $1,764
-
kWh
-
TOTAL RECOMMENDED $28,186 $29,247 $27,583
487,103
kWh
$603
-
MMBtu
TOTAL IMPLEMENTED $5,026 $8,875 $4,423
50,117
kWh
$603
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs