Assessment Year | 1996 |
---|---|
Principal Product | Aluminum Truck Parts |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
52,000
ft2
|
Annual Production | 9,700,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $373,860 | 10,545,721 |
kWh
|
$0.035 |
Electricity Demand | $71,028 | 37,522 |
kW-mo/yr
|
$1.89 |
Electricity Fees | $19,386 | - |
|
- |
Natural Gas | $214,537 | 56,311 |
MMBtu
|
$3.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $124,052 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.2135: Extend solution life with filtering or carbonate freezing | $5,657 | $2,800 |
$(-343.0)
(-9,672)
kWh
|
$(-58.0)
-
kW-mo/yr
|
- | - |
$428
-
gal
|
$5,630 | |
02 | 2.4224: Upgrade controls on compressors | $16,123 | $7,260 |
$13,716
385,698
kWh
|
$2,407
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,329 | $5,300 |
$2,753
77,374
kWh
|
$576
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.3212: Optimize plant power factor | $3,043 | $10,600 | - | - | $3,043 | - | - | - | |
05 | 2.1133: Adjust burners for efficient operation | $70,500 | $45,000 | - | - | - |
$70,500
-
MMBtu
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,400 | $179,000 |
$42,700
1,200,469
kWh
|
$10,500
-
kW-mo/yr
|
- |
$(-27,800.0)
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $124,052 | $249,960 |
$58,826
1,653,869
kWh
|
$13,425
-
kW-mo/yr
|
$3,043 |
$42,700
-
MMBtu
|
$428
-
gal
|
$5,630 | ||
TOTAL IMPLEMENTED | $21,780 | $10,060 |
$13,373
376,026
kWh
|
$2,349
-
kW-mo/yr
|
- | - |
$428
-
gal
|
$5,630 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs