ITAC Assessment: TN0304
ITAC logo
ITAC Assessment: TN0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC FURNITURE
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $313,182 6,065,065
kWh
Natural Gas $17,755 3,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,189 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $10,943 $650 $10,943
210,434
kWh
-
02 2.7261: Install timers and/or thermostats $2,510 $2,700 - $2,510
-
MMBtu
03 2.2614: Use cooling tower or economizer to replace chiller cooling $6,630 $12,000 $6,630
127,491
kWh
-
04 2.6232: Install set-back timers $4,039 - $4,039
77,667
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $2,637 $2,680 $2,637
50,703
kWh
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,707 - $1,707
32,825
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,174 - $1,174
22,567
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $549 $94 $549
10,551
kWh
-
TOTAL RECOMMENDED $30,189 $18,124 $27,679
532,238
kWh
$2,510
-
MMBtu
TOTAL IMPLEMENTED $17,619 $3,330 $17,619
338,804
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs