ITAC Assessment: KU0218
ITAC logo
ITAC Assessment: KU0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product TWO LITER PLASTIC BOTTLE
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area
n/a
Annual Production 85,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,269,837 25,368,113
kWh
Natural Gas $16,506 4,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $27,756 $3,000 $27,756
554,513
kWh
02 2.4312: Improve lubrication practices $24,382 - $24,382
487,104
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,063 $25,287 $16,063
320,926
kWh
04 2.2511: Insulate bare equipment $5,457 $2,500 $5,457
109,027
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,325 $500 $5,325
106,389
kWh
06 2.4221: Install compressor air intakes in coolest locations $3,257 $400 $3,257
65,064
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,335 $305 $1,335
26,671
kWh
TOTAL RECOMMENDED $83,575 $31,992 $83,575
1,669,694
kWh
TOTAL IMPLEMENTED $28,180 $28,592 $28,180
563,013
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs