Assessment Year | 1996 |
---|---|
Principal Product | Sugar-Based Candy |
NAICS |
n/a
|
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
38,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,035 | 706,917 |
kWh
|
$0.088 |
Electricity Demand | $12,692 | 2,813 |
kW-mo/yr
|
$4.51 |
Natural Gas | $58,910 | 9,915 |
MMBtu
|
$5.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,292 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $3,884 | $9,200 |
$3,884
44,256
kWh
|
- | - | - | - | |
02 | 2.2135: Repair and eliminate steam leaks | $2,060 | $250 | - | - |
$2,060
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $828 | $150 |
$804
9,086
kWh
|
$24
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $590 | $1,016 |
$496
5,569
kWh
|
$94
-
kW-mo/yr
|
- | - | - | |
05 | 2.2122: Install / repair insulation on condensate lines | $346 | $308 | - | - |
$346
-
MMBtu
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $688 | $889 |
$865
9,672
kWh
|
$61
-
kW-mo/yr
|
$(-238.0)
-
MMBtu
|
- | - | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $5,740 | $780 | - | - | - |
$5,740
-
Tgal
|
- | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,156 | $250 | - | - | - | - |
$2,156
-
lb
|
|
TOTAL RECOMMENDED | $16,292 | $12,843 |
$6,049
68,583
kWh
|
$179
-
kW-mo/yr
|
$2,168
-
MMBtu
|
$5,740
-
Tgal
|
$2,156
-
lb
|
||
TOTAL IMPLEMENTED | $16,292 | $12,843 |
$6,049
68,583
kWh
|
$179
-
kW-mo/yr
|
$2,168
-
MMBtu
|
$5,740
-
Tgal
|
$2,156
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs