ITAC Assessment: SF0101
ITAC logo
ITAC Assessment: SF0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Sugar-Based Candy
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 38,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,035 706,917
kWh
Electricity Demand $12,692 2,813
kW-mo/yr
Natural Gas $58,910 9,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,292

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7241: Install outside air damper / economizer on hvac unit $3,884 $9,200 $3,884
44,256
kWh
- - - -
02 2.2135: Repair and eliminate steam leaks $2,060 $250 - - $2,060
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $828 $150 $804
9,086
kWh
$24
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $590 $1,016 $496
5,569
kWh
$94
-
kW-mo/yr
- - -
05 2.2122: Install / repair insulation on condensate lines $346 $308 - - $346
-
MMBtu
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $688 $889 $865
9,672
kWh
$61
-
kW-mo/yr
$(-238.0)
-
MMBtu
- -
07 3.4111: Use closed cycle process to minimize waste water production $5,740 $780 - - - $5,740
-
Tgal
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $2,156 $250 - - - - $2,156
-
lb
TOTAL RECOMMENDED $16,292 $12,843 $6,049
68,583
kWh
$179
-
kW-mo/yr
$2,168
-
MMBtu
$5,740
-
Tgal
$2,156
-
lb
TOTAL IMPLEMENTED $16,292 $12,843 $6,049
68,583
kWh
$179
-
kW-mo/yr
$2,168
-
MMBtu
$5,740
-
Tgal
$2,156
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs