ITAC Assessment: TN0294
ITAC logo
ITAC Assessment: TN0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MEN'S & WOMEN`S APPAREL
NAICS
n/a
SIC 2322: Men's and Boys' Underwear and Nightwear
Sales Range $10
M
to 50
M
# of Employees 530
Plant Area
n/a
Annual Production 14,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,841 2,628,077
kWh
Natural Gas $31,595 4,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $10,135 $2,675 - $10,135
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,406 $195 $2,406
42,204
kWh
-
03 2.2136: Install / repair insulation on steam lines $797 $941 - $797
-
MMBtu
04 2.6232: Install set-back timers $1,320 - $1,320
23,154
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $201 $600 - $201
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $567 - $567
9,965
kWh
-
07 2.2511: Insulate bare equipment $386 $152 $386
6,741
kWh
-
TOTAL RECOMMENDED $15,812 $4,563 $4,679
82,064
kWh
$11,133
-
MMBtu
TOTAL IMPLEMENTED $15,225 $3,811 $4,293
75,323
kWh
$10,932
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs