| Assessment Year | 1982 |
|---|---|
| Principal Product | MATTRESSES,BOX SPRINGS |
| NAICS |
n/a
|
| SIC | 2515: Mattresses, Foundations, and Convertible Beds |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 212,000
pieces
|
| Production Hrs. Annual | 2,150
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,773 | 2,889,801 |
kWh
|
$0.037 |
| Natural Gas | $47,548 | 28,424 |
MMBtu
|
$1.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,768 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,357 | $700 |
$11,357
161,489
kWh
|
- | |
| 02 | 2.5194: Redesign process | $18,787 | $112,000 |
$18,787
266,120
kWh
|
- | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,266 | $2,500 | - |
$6,266
-
MMBtu
|
|
| 04 | 2.7261: Install timers and/or thermostats | $27,712 | $215 |
$2,379
33,705
kWh
|
$25,333
-
MMBtu
|
|
| 05 | 2.1123: Install automatic stack damper | $6,768 | $3,500 | - |
$6,768
-
MMBtu
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,948 | $370 |
$3,948
55,979
kWh
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,115 | $1,000 | - |
$2,115
-
MMBtu
|
|
| TOTAL RECOMMENDED | $76,953 | $120,285 |
$36,471
517,293
kWh
|
$40,482
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,768 | $3,500 | - |
$6,768
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs