ITAC Assessment: KU0047
ITAC logo
ITAC Assessment: KU0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MATTRESSES,BOX SPRINGS
NAICS
n/a
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 212,000
pieces
Production Hrs. Annual 2,150
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,773 2,889,801
kWh
Natural Gas $47,548 28,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,357 $700 $11,357
161,489
kWh
-
02 2.5194: Redesign process $18,787 $112,000 $18,787
266,120
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $6,266 $2,500 - $6,266
-
MMBtu
04 2.7261: Install timers and/or thermostats $27,712 $215 $2,379
33,705
kWh
$25,333
-
MMBtu
05 2.1123: Install automatic stack damper $6,768 $3,500 - $6,768
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,948 $370 $3,948
55,979
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,115 $1,000 - $2,115
-
MMBtu
TOTAL RECOMMENDED $76,953 $120,285 $36,471
517,293
kWh
$40,482
-
MMBtu
TOTAL IMPLEMENTED $6,768 $3,500 - $6,768
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs