ITAC Assessment: TN0292
ITAC logo
ITAC Assessment: TN0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HOUSE SLIPPERS
NAICS
n/a
SIC 3142: House Slippers
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,979 227,140
kWh
Natural Gas $12,131 2,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $3,140 $12,500 - $3,140
-
MMBtu
02 2.6232: Install set-back timers $1,198 - $1,198
18,171
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $947 $2,960 $947
14,361
kWh
-
04 2.7444: Close holes and openings in building such as broken windows $206 $175 - $206
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $152 $75 $135
2,052
kWh
$17
-
MMBtu
TOTAL RECOMMENDED $5,643 $15,710 $2,280
34,584
kWh
$3,363
-
MMBtu
TOTAL IMPLEMENTED $1,556 $250 $1,333
20,223
kWh
$223
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs