ITAC Assessment: TN0288
ITAC logo
ITAC Assessment: TN0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WOOD BURNING STOVES
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 33,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,444 606,975
kWh
LPG $11,697 1,374
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,032 $8,712 $4,032
53,048
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,648 - $1,648
21,688
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $881 $120 $881
11,430
kWh
04 2.6232: Install set-back timers $534 - $534
7,034
kWh
05 2.4221: Install compressor air intakes in coolest locations $537 $236 $537
7,034
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $223 $600 $223
2,931
kWh
TOTAL RECOMMENDED $7,855 $9,668 $7,855
103,165
kWh
TOTAL IMPLEMENTED $2,175 $956 $2,175
28,429
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs