Assessment Year | 2013 |
---|---|
Principal Product | Aircraft |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
84,000
ft2
|
Annual Production | 10
pieces
|
Production Hrs. Annual | 2,856
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,911 | 934,240 |
kWh
|
$0.062 |
Electricity Demand | $18,519 | 3,577 |
kW-mo/yr
|
$5.18 |
Natural Gas | $12,827 | 1,733 |
MMBtu
|
$7.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,052 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.5195: Change product design to reduce energy requirements | $3,444 | $500 | - | - | - | $3,444 | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $2,989 | $218 | - | - |
$2,989
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,022 | $26,934 |
$5,157
85,950
kWh
|
$1,865
-
kW-mo/yr
|
- | - | |
04 | 2.2514: Cover open tanks | $418 | $310 | - | - |
$418
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $1,748 | $697 |
$1,748
28,194
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $871 | $15 |
$749
12,478
kWh
|
$122
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $16,492 | $28,674 |
$7,654
126,622
kWh
|
$1,987
-
kW-mo/yr
|
$3,407
-
MMBtu
|
$3,444 | ||
TOTAL IMPLEMENTED | $9,052 | $1,430 |
$2,497
40,672
kWh
|
$122
-
kW-mo/yr
|
$2,989
-
MMBtu
|
$3,444 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs