ITAC Assessment: BS0022
ITAC logo
ITAC Assessment: BS0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Aircraft
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 84,000
ft2
Annual Production 10
pieces
Production Hrs. Annual 2,856
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,911 934,240
kWh
Electricity Demand $18,519 3,577
kW-mo/yr
Natural Gas $12,827 1,733
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.5195: Change product design to reduce energy requirements $3,444 $500 - - - $3,444
02 2.7221: Lower temperature during the winter season and vice-versa $2,989 $218 - - $2,989
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,022 $26,934 $5,157
85,950
kWh
$1,865
-
kW-mo/yr
- -
04 2.2514: Cover open tanks $418 $310 - - $418
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $1,748 $697 $1,748
28,194
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $871 $15 $749
12,478
kWh
$122
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,492 $28,674 $7,654
126,622
kWh
$1,987
-
kW-mo/yr
$3,407
-
MMBtu
$3,444
TOTAL IMPLEMENTED $9,052 $1,430 $2,497
40,672
kWh
$122
-
kW-mo/yr
$2,989
-
MMBtu
$3,444
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs