ITAC Assessment: TN0287
ITAC logo
ITAC Assessment: TN0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product SNACK FOODS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 4,160,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,239 2,039,273
kWh
Natural Gas $325,839 75,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,791 - - $6,291
-
MMBtu
$500
02 2.2425: Use flue gases to heat process or service water $5,418 $17,075 - $5,418
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,458 $398 - $1,458
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $1,277 $750 - $1,277
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,422 $820 $1,422
29,015
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $288 $1,000 - $288
-
MMBtu
-
07 2.2122: Install / repair insulation on condensate lines $159 $35 - $159
-
MMBtu
-
08 2.6232: Install set-back timers $531 - $531
10,844
kWh
- -
09 2.2163: Use minimum steam operating pressure $82 - - $82
-
MMBtu
-
TOTAL RECOMMENDED $17,426 $20,078 $1,953
39,859
kWh
$14,973
-
MMBtu
$500
TOTAL IMPLEMENTED $1,806 $1,785 - $1,806
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs