ITAC Assessment: TN0261
ITAC logo
ITAC Assessment: TN0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CLOTHING
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $1
M
to 5
M
# of Employees 140
Plant Area
n/a
Annual Production 470,400
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,210 318,875
kWh
Natural Gas $4,486 947
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,664 $1,400 - $1,664
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $1,200 $75 $1,200
19,050
kWh
-
03 2.6232: Install set-back timers $628 - $628
9,965
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $554 $300 $554
8,792
kWh
-
05 2.2136: Install / repair insulation on steam lines $129 $100 $129
2,052
kWh
-
06 2.2122: Install / repair insulation on condensate lines $111 $35 $111
1,758
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $92 - $92
1,465
kWh
-
TOTAL RECOMMENDED $4,378 $1,910 $2,714
43,082
kWh
$1,664
-
MMBtu
TOTAL IMPLEMENTED $2,714 $510 $2,714
43,082
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs