ITAC Assessment: TN0255
ITAC logo
ITAC Assessment: TN0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product NEWSPAPERS,AD CIRCULARS
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 3,400,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,721 116,061
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7234: Use heat pump for space conditioning $1,340 $2,000 $1,340
24,033
kWh
02 2.7261: Install timers and/or thermostats $1,207 $1,640 $1,207
20,809
kWh
03 2.7447: Install vinyl strip / high speed / air curtain doors $340 $250 $340
5,862
kWh
04 2.7447: Install vinyl strip / high speed / air curtain doors $255 $560 $255
4,396
kWh
05 2.7492: Use proper thickness of insulation on building envelope $238 $265 $238
4,103
kWh
06 2.7111: Reduce illumination to minimum necessary levels $119 - $119
2,052
kWh
07 2.4231: Reduce the pressure of compressed air to the minimum required $51 - $51
879
kWh
TOTAL RECOMMENDED $3,550 $4,715 $3,550
62,134
kWh
TOTAL IMPLEMENTED $1,836 $2,155 $1,836
31,653
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs