ITAC Assessment: TN0239
ITAC logo
ITAC Assessment: TN0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLASTIC BUCKETS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 325,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,560 713,072
kWh
Natural Gas $9,456 1,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $2,129 $180 - $2,129
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $1,382 - $1,382
24,912
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,463 $75 $1,463
26,377
kWh
-
04 2.6232: Install set-back timers $488 - $488
8,792
kWh
-
TOTAL RECOMMENDED $5,462 $255 $3,333
60,081
kWh
$2,129
-
MMBtu
TOTAL IMPLEMENTED $5,462 $255 $3,333
60,081
kWh
$2,129
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs