Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product STEEL JOINTS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 6,000
ton
Production Hrs. Annual 4,290
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,430 1,892,145
kWh
LPG $17,803 2,061
MMBtu
Fuel Oil #2 $9,500 1,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $5,090 $13,000 $(-4,410.0)
(-77,374)
kWh
- $9,500
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,768 $95 $7,768
136,284
kWh
- - -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $6,670 - $6,670
116,940
kWh
- - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,236 $500 $1,236
21,688
kWh
- - -
05 2.4222: Install adequate dryers on air lines to eliminate blowdown $18,012 $10,000 $322
5,569
kWh
- - $17,690
06 2.7221: Lower temperature during the winter season and vice-versa $1,056 - $1,056
18,464
kWh
- - -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,159 $3,500 $1,854
32,532
kWh
$(-695.0)
-
MMBtu
- -
TOTAL RECOMMENDED $40,991 $27,095 $14,496
254,103
kWh
$(-695.0)
-
MMBtu
$9,500
-
MMBtu
$17,690
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs