ITAC Assessment: TN0221
ITAC logo
ITAC Assessment: TN0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product AUTO TRANSFER SWITCHES
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $5
M
to 10
M
# of Employees 57
Plant Area
n/a
Annual Production 2,285
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,924 1,542,204
kWh
Natural Gas $33,741 5,949
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2424: Use heat in flue gases to preheat products or materials $4,406 $7,000 - $4,406
-
MMBtu
02 2.2437: Recover waste heat from equipment $1,248 $8,600 - $1,248
-
MMBtu
03 2.6232: Install set-back timers $2,849 $10,000 $2,849
47,479
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $773 $475 $300
4,982
kWh
$473
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $967 - $967
16,120
kWh
-
06 2.1123: Install automatic stack damper $148 $420 - $148
-
MMBtu
07 2.2532: Use only amount of air necessary to prevent explosion hazard $237 - $123
2,052
kWh
$114
-
MMBtu
TOTAL RECOMMENDED $10,628 $26,495 $4,239
70,633
kWh
$6,389
-
MMBtu
TOTAL IMPLEMENTED $2,125 $895 $1,390
23,154
kWh
$735
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs