ITAC Assessment: TN0194
ITAC logo
ITAC Assessment: TN0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product STONE TILES ,WALL PANEL
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,642 325,029
kWh
Natural Gas $7,993 1,308
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6124: Establish equipment maintenance schedule $1,460 $17 - $1,460
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $410 - $410
10,258
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $180 - - $180
-
MMBtu
04 2.6232: Install set-back timers $70 $824 $70
1,758
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $148 $850 $148
3,810
kWh
-
06 2.6124: Establish equipment maintenance schedule $260 $296 $260
6,448
kWh
-
TOTAL RECOMMENDED $2,528 $1,987 $888
22,274
kWh
$1,640
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs