ITAC Assessment: MA0079
ITAC logo
ITAC Assessment: MA0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product COATED POLYESTER FILMS
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 180,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $381,482 5,752,931
kWh
Natural Gas $423,515 69,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $478 $350 $478
7,327
kWh
-
02 2.2113: Repair or replace steam traps $4,572 $600 - $4,572
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,763 $4,700 $8,763
132,181
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,519 $13,000 $6,519
98,476
kWh
-
05 2.2515: Use optimum thickness insulation $21,098 $5,000 - $21,098
-
MMBtu
TOTAL RECOMMENDED $41,430 $23,650 $15,760
237,984
kWh
$25,670
-
MMBtu
TOTAL IMPLEMENTED $34,911 $10,650 $9,241
139,508
kWh
$25,670
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs