ITAC Assessment: TN0193
ITAC logo
ITAC Assessment: TN0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SAW BLADES
NAICS
n/a
SIC 3425: Saw Blades and Handsaws
Sales Range less than $500
k
# of Employees 20
Plant Area
n/a
Annual Production 14,350
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,746 137,456
kWh
Natural Gas $2,197 451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7244: Revise smoke cleanup from operations $657 $2,772 $657
16,413
kWh
-
02 2.7261: Install timers and/or thermostats $1,146 $800 - $1,146
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $175 - $175
4,396
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $730 $529 - $730
-
MMBtu
TOTAL RECOMMENDED $2,708 $4,101 $832
20,809
kWh
$1,876
-
MMBtu
TOTAL IMPLEMENTED $1,562 $3,301 $832
20,809
kWh
$730
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs