ITAC Assessment: TA0099
ITAC logo
ITAC Assessment: TA0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Beverage and Dairy Crates
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 125,000
ft2
Annual Production 6,370,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $973,112 14,994,071
kWh
Electricity Demand $165,409 22,901
kW-mo/yr
Natural Gas $9,820 1,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $26,045 $2,079 $26,045
421,742
kWh
- - -
02 3.5111: Filter and reuse hydraulic oil $25,230 $6,200 - - $25,230
-
gal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $23,435 $11,735 $20,765
336,257
kWh
$2,670
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,725 $55 $3,300
53,440
kWh
$425
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $2,090 $600 $1,750
28,279
kWh
$340
-
kW-mo/yr
- -
06 2.7444: Close holes and openings in building such as broken windows $1,170 $1,575 $1,170
18,962
kWh
- - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $1,010 - - - - $1,010
-
lb
08 2.7135: Install occupancy sensors $870 $325 $870
14,126
kWh
- - -
TOTAL RECOMMENDED $83,575 $22,569 $53,900
872,806
kWh
$3,435
-
kW-mo/yr
$25,230
-
gal
$1,010
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs