Assessment Year | 2004 |
---|---|
Principal Product | Plastic Products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
75,000
ft2
|
Annual Production | 1,060,000
lb
|
Production Hrs. Annual | 8,688
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,138,988 | 19,982,254 |
kWh
|
$0.057 |
Electricity Demand | $147,412 | 30,629 |
kW-mo/yr
|
$4.81 |
Electricity Fees | $240 | - |
|
- |
Natural Gas | $11,529 | 1,367 |
MMBtu
|
$8.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $24,080 | $31,600 |
$24,080
442,550
kWh
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $14,775 | - |
$14,775
259,235
kWh
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $11,360 | - |
$11,360
199,330
kWh
|
- | - | |
04 | 3.5112: Reprocess spent oils on site for re-use | $11,120 | $2,795 | - | - |
$11,120
-
Tgal
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,390 | $40 |
$3,020
53,000
kWh
|
$370
-
kW-mo/yr
|
- | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,255 | $190 |
$1,180
20,700
kWh
|
$75
-
kW-mo/yr
|
- | |
07 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $1,035 | - |
$925
16,200
kWh
|
$110
-
kW-mo/yr
|
- | |
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,880 | - |
$2,880
50,544
kWh
|
- | - | |
TOTAL RECOMMENDED | $69,895 | $34,625 |
$58,220
1,041,559
kWh
|
$555
-
kW-mo/yr
|
$11,120
-
Tgal
|
||
TOTAL IMPLEMENTED | $30,560 | $40 |
$30,080
527,765
kWh
|
$480
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs