Assessment Year | 1993 |
---|---|
Principal Product | FLOUR AND CORN TORTILLAS |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
n/a
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 8,200
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,044 | 820,926 |
kWh
|
$0.093 |
Natural Gas | $68,972 | 15,454 |
MMBtu
|
$4.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,453 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $969 | $475 |
$1,026
11,137
kWh
|
- | $(-57.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,082 | $1,440 |
$2,082
22,567
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,276 | $1,520 |
$1,276
13,775
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $698 | $225 |
$698
7,620
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,153 | $653 |
$1,153
12,309
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $443 | - |
$443
4,689
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,523 | - |
$1,523
16,413
kWh
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $309 | $400 | - |
$309
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $8,453 | $4,713 |
$8,201
88,510
kWh
|
$309
-
MMBtu
|
$(-57.0) | ||
TOTAL IMPLEMENTED | $7,312 | $4,488 |
$7,060
76,201
kWh
|
$309
-
MMBtu
|
$(-57.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs