ITAC Assessment: DS0154
ITAC logo
ITAC Assessment: DS0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Electrocoat and Powder Coat Painting
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 10,000
ft2
Annual Production 1,988,000
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,223 1,235,639
kWh
Electricity Demand $12,390 3,768
kW-mo/yr
Electricity Fees $1,446 -
Natural Gas $45,565 8,879
MMBtu
LPG $2,612 184
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $1,239 $864 - - $1,239
-
MMBtu
- - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,609 $10,510 $2,745
85,873
kWh
$6,941
-
kW-mo/yr
$(-2,077.0)
-
MMBtu
- - - - -
03 2.2425: Use flue gases to heat process or service water $2,737 $8,160 $2,737
47,186
kWh
- - - - - - -
04 3.8143: Recycle cleaning solvent and reuse $18,740 $17,676 $(-339.0)
(-6,155)
kWh
- - $6,870
-
gal
$(-3,432.0) - $15,641 -
05 3.4156: Use flow control valves on equipment to optimize water use $3,521 $1,336 - - - - - - - $3,521
-
Tgal
06 4.431: Train operators for maximum operating efficiency $4,884 - - - - - $(-1,716.0) $6,600 - -
TOTAL RECOMMENDED $38,730 $38,546 $5,143
126,904
kWh
$6,941
-
kW-mo/yr
$(-838.0)
-
MMBtu
$6,870
-
gal
$(-5,148.0) $6,600 $15,641 $3,521
-
Tgal
TOTAL IMPLEMENTED $28,384 $19,876 $(-339.0)
(-6,155)
kWh
- $1,239
-
MMBtu
$6,870
-
gal
$(-5,148.0) $6,600 $15,641 $3,521
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs