ITAC Assessment: CO0159
ITAC logo
ITAC Assessment: CO0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product NEWSPAPERS & COMMERCIAL PRINTING
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,295 1,553,048
kWh
Natural Gas $12,617 3,743
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $3,197 $250 $2,692
-
kWh
$505
-
MMBtu
02 2.7314: Reduce ventilation air $2,200 $100 $860
19,930
kWh
$1,340
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,200 $4,560 $2,200
50,703
kWh
-
04 2.3191: Use demand controller or load shedder $1,890 $2,400 $1,890
-
kWh
-
05 2.4239: Eliminate or reduce compressed air usage $1,770 $2,400 $1,770
41,032
kWh
-
06 2.2437: Recover waste heat from equipment $232 $700 - $232
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $270 $50 $270
6,155
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $426 $488 $426
9,672
kWh
-
09 2.6232: Install set-back timers $260 $210 $260
5,862
kWh
-
10 2.6218: Turn off equipment when not in use $760 $50 $335
7,620
kWh
$425
-
MMBtu
11 2.7261: Install timers and/or thermostats $520 $300 - $520
-
MMBtu
TOTAL RECOMMENDED $13,725 $11,508 $10,703
140,974
kWh
$3,022
-
MMBtu
TOTAL IMPLEMENTED $10,843 $8,358 $8,478
133,354
kWh
$2,365
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs