Assessment Year | 2001 |
---|---|
Principal Product | Missile Casing, Ordinance & Alum. For. |
NAICS |
n/a
|
SIC | 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
195,000
ft2
|
Annual Production | 25,000,000
ton
|
Production Hrs. Annual | 6,448
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $735,046 | 23,235,120 |
kWh
|
$0.032 |
Electricity Demand | $172,995 | 54,401 |
kW-mo/yr
|
$3.18 |
Electricity Fees | $87,192 | - |
|
- |
Natural Gas | $1,201,382 | 175,233 |
MMBtu
|
$6.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $469,224 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $465,114 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $420,482 | $9,456 |
$(-19,798.0)
(-464,256)
kWh
|
$(-2,748.0)
-
kW-mo/yr
|
$443,028
-
MMBtu
|
|
02 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $15,055 | $600 |
$13,720
321,700
kWh
|
$1,335
-
kW-mo/yr
|
- | |
03 | 2.2511: Insulate bare equipment | $13,585 | $2,910 |
$13,585
318,580
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,090 | $1,200 |
$11,090
260,090
kWh
|
- | - | |
05 | 2.2514: Cover open tanks | $2,000 | $3,900 |
$2,000
46,857
kWh
|
- | - | |
06 | 2.7444: Close holes and openings in building such as broken windows | $1,920 | $54 |
$1,920
45,075
kWh
|
- | - | |
07 | 2.7134: Use photocell controls | $1,696 | $225 |
$1,362
31,938
kWh
|
$334
-
kW-mo/yr
|
- | |
08 | 2.4314: Use synthetic lubricant | $1,600 | - |
$1,380
32,488
kWh
|
$220
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $1,032 | $320 |
$1,032
24,200
kWh
|
- | - | |
10 | 2.7122: Disconnect ballasts | $510 | $982 |
$450
10,562
kWh
|
$60
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $254 | $542 |
$230
5,396
kWh
|
$24
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $469,224 | $20,189 |
$26,971
632,630
kWh
|
$(-775.0)
-
kW-mo/yr
|
$443,028
-
MMBtu
|
||
TOTAL IMPLEMENTED | $465,114 | $15,307 |
$23,141
542,723
kWh
|
$(-1,055.0)
-
kW-mo/yr
|
$443,028
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs