Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Vinyl Windows
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 325
Plant Area 235,000
ft2
Annual Production 380,000
units
Production Hrs. Annual 4,200
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $595,692 3,941,880
kWh
Electricity Demand $159,579 9,118
kW-mo/yr
Electricity Fees $11,210 -
Natural Gas $44,931 2,410
MMBtu
TOTAL YEARLY COSTS $811,411
RECOMMENDED SAVINGS* $283,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,979 - - $7,979
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,928 - $5,928
39,258
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $6,027 $863 $6,027
39,913
kWh
- - - -
04 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,856 $2,202 $11,856
78,516
kWh
- - - -
05 2.7135: Install occupancy sensors $2,892 $889 $2,892
19,152
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,486 $1,983 $3,044
20,160
kWh
$1,008
-
kW-mo/yr
- - $434
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,935 $1,261 - - $1,935
-
MMBtu
- -
08 2.4322: Use or replace with energy efficient substitutes $660 $565 $410
2,716
kWh
$65
-
kW-mo/yr
- - $185
09 2.6211: Conserve energy by efficient use of vending machines $1,131 $1,261 $1,131
7,489
kWh
- - - -
10 2.9114: Use solar heat to make electricty $6,618 $7,625 $6,618
43,830
kWh
- - - -
11 3.4151: Minimize water usage $11,059 $38,105 - - - $11,059
-
Tgal
-
12 2.7492: Use proper thickness of insulation on building envelope $752 $3,264 - - $752
-
MMBtu
- -
13 2.7232: Replace existing hvac unit with high efficiency model $25,628 $119,927 $855
5,664
kWh
- $24,772
-
MMBtu
- -
14 2.9114: Use solar heat to make electricty $194,681 $1,183,104 $194,681
1,289,280
kWh
- - - -
15 2.7243: Improve air circulation with destratification fans / other methods $1,440 $10,620 $(-161.3)
(-1,068)
kWh
$(-29.4)
-
kW-mo/yr
$1,631
-
MMBtu
- -
TOTAL RECOMMENDED $283,072 $1,371,668 $233,282
1,544,911
kWh
$9,023
-
kW-mo/yr
$29,090
-
MMBtu
$11,059
-
Tgal
$618
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs