ITAC Assessment: SU0594
ITAC logo
ITAC Assessment: SU0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product CNC machined parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 28,000
ft2
Annual Production 226
units
Production Hrs. Annual 4,030
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,019 469,168
kWh
Electricity Demand $40,813 3,467
kW-mo/yr
Electricity Fees $240 -
Natural Gas $3,158 828
MMBtu
Other Gas $272 1
MMBtu
Other Energy $16,689 1
MMBtu
TOTAL YEARLY COSTS $92,191
RECOMMENDED SAVINGS* $7,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,040 - - $2,040
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $2,031 - $2,031
30,768
kWh
- - -
03 2.8121: Apply for tax-free status for energy purchases $192 - - - - $192
04 2.7224: Reduce space conditioning during non-working hours $244 - - - $244
-
MMBtu
-
05 2.4322: Use or replace with energy efficient substitutes $437 $16 $252
3,825
kWh
$247
-
kW-mo/yr
$(-62.2)
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $808 $41 $808
12,246
kWh
- - -
07 2.2437: Recover waste heat from equipment $166 $142 - - $166
-
MMBtu
-
08 2.7135: Install occupancy sensors $577 $574 $577
8,745
kWh
- - -
09 2.4322: Use or replace with energy efficient substitutes $381 $508 $179
2,716
kWh
$44
-
kW-mo/yr
- $158
10 2.4221: Install compressor air intakes in coolest locations $251 $356 $251
3,809
kWh
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $469 $851 $251
3,804
kWh
$133
-
kW-mo/yr
- $85
12 2.6211: Conserve energy by efficient use of vending machines $203 $374 $203
3,066
kWh
- - -
13 2.7447: Install vinyl strip / high speed / air curtain doors $167 $334 - - $167
-
MMBtu
-
TOTAL RECOMMENDED $7,967 $3,195 $4,553
68,980
kWh
$2,464
-
kW-mo/yr
$515
-
MMBtu
$435
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs