Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Hot dip galvanizing and steel coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 74
Plant Area 36,400
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,265 965,900
kWh
Electricity Demand $34,086 2,992
kW-mo/yr
Electricity Fees $13,970 -
Natural Gas $32,793 4,778
MMBtu
Waste Disposal Costs
Water Usage $3,000 162
Tgal
TOTAL YEARLY COSTS $123,113
RECOMMENDED SAVINGS* $8,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $4,564 $96 - - $4,564 - -
02 2.4239: Eliminate or reduce compressed air usage $550 - $550
13,426
kWh
- - - -
03 2.2136: Install / repair insulation on steam lines $516 $372 - - - $516
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,196 $1,615 $430
10,494
kWh
$215
-
kW-mo/yr
- - $551
05 2.4322: Use or replace with energy efficient substitutes $355 $612 $99
2,409
kWh
$38
-
kW-mo/yr
- - $218
06 2.7447: Install vinyl strip / high speed / air curtain doors $247 $451 - - - $247
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $124 $343 - - - $124
-
MMBtu
-
08 2.2437: Recover waste heat from equipment $151 $424 - - - $151
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $123 $882 $123
2,997
kWh
- - - -
10 2.7495: Install replacement doors $310 $2,745 - - - $310
-
MMBtu
-
11 2.7135: Install occupancy sensors $116 $1,580 $116
2,821
kWh
- - - -
TOTAL RECOMMENDED $8,252 $9,120 $1,318
32,147
kWh
$253
-
kW-mo/yr
$4,564 $1,347
-
MMBtu
$769
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs