ITAC Assessment: SU0502
ITAC logo
ITAC Assessment: SU0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Roll up shutter doors for emergency vehicles
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 31,800
ft2
Annual Production 5,000
units
Production Hrs. Annual 4,290
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,563 2,642,176
kWh
Electricity Demand $51,275 7,807
kW-mo/yr
Electricity Fees $283 -
Natural Gas $87,006 16,567
MMBtu
TOTAL YEARLY COSTS $181,127
RECOMMENDED SAVINGS* $10,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,299

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $5,573 $66 - - - - - $5,573
02 2.7441: Replace broken windows and/or window sash $1,847 $93 - - $1,847
-
MMBtu
- - -
03 2.7314: Reduce ventilation air $592 $499 $49
2,997
kWh
- $543
-
MMBtu
- - -
04 3.1161: Eliminate/reduce an operation $1,845 $2,386 $20
1,192
kWh
$512
-
kW-mo/yr
- $23 $1,290 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $177 $244 $42
2,628
kWh
$30
-
kW-mo/yr
- $139 $(-34.7) -
06 2.4221: Install compressor air intakes in coolest locations $275 $402 $275
17,204
kWh
- - - - -
TOTAL RECOMMENDED $10,309 $3,690 $386
24,021
kWh
$542
-
kW-mo/yr
$2,390
-
MMBtu
$162 $1,255 $5,573
TOTAL IMPLEMENTED $2,299 $739 $317
19,832
kWh
$30
-
kW-mo/yr
$1,847
-
MMBtu
$139 $(-34.7) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs