Assessment Year | 2000 |
---|---|
Principal Product | Wooden Furniture |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
58,000
ft2
|
Annual Production | 109,665
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,613 | 390,844 |
kWh
|
$0.086 |
Electricity Fees | $5,246 | - |
|
- |
Natural Gas | $2,884 | 440 |
MMBtu
|
$6.55 |
LPG | $3,138 | 404 |
MMBtu
|
$7.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,432 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $878 | $635 | n/a |
$(-87.0)
(-1,017)
kWh
|
$(-4.0) |
$969
-
MMBtu
|
- | - |
02 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $1,244 | $525 | n/a |
$1,185
13,775
kWh
|
$59 | - | - | - |
03 | 2.7145: Install skylights | $1,332 | $4,380 | n/a |
$1,269
14,760
kWh
|
$63 | - | - | - |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $499 | - | n/a |
$475
5,524
kWh
|
$24 | - | - | - |
05 | 3.8121: Cover containers to minimize evaporative losses | $20,979 | $900 | n/a | - | - | - | $20,979 | - |
06 | 4.625: Develop standard operating procedures | $4,500 | $20,700 | n/a | - | - | - | - | $4,500 |
TOTAL RECOMMENDED | $29,432 | $27,140 |
$2,842
33,042
kWh
|
$142 |
$969
-
MMBtu
|
$20,979 | $4,500 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs