ITAC Assessment: GT0690
ITAC logo
ITAC Assessment: GT0690
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wooden Furniture
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 58,000
ft2
Annual Production 109,665
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,613 390,844
kWh
Electricity Fees $5,246 -
Natural Gas $2,884 440
MMBtu
LPG $3,138 404
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $878 $635 n/a $(-87.0)
(-1,017)
kWh
$(-4.0) $969
-
MMBtu
- -
02 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,244 $525 n/a $1,185
13,775
kWh
$59 - - -
03 2.7145: Install skylights $1,332 $4,380 n/a $1,269
14,760
kWh
$63 - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $499 - n/a $475
5,524
kWh
$24 - - -
05 3.8121: Cover containers to minimize evaporative losses $20,979 $900 n/a - - - $20,979 -
06 4.625: Develop standard operating procedures $4,500 $20,700 n/a - - - - $4,500
TOTAL RECOMMENDED $29,432 $27,140 $2,842
33,042
kWh
$142 $969
-
MMBtu
$20,979 $4,500
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs