| Assessment Year | 2000 |
|---|---|
| Principal Product | Wooden Furniture |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
58,000
ft2
|
| Annual Production | 109,665
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,613 | 390,844 |
kWh
|
$0.086 |
| Electricity Fees | $5,246 | - |
|
- |
| Natural Gas | $2,884 | 440 |
MMBtu
|
$6.55 |
| LPG | $3,138 | 404 |
MMBtu
|
$7.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,432 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $878 | $635 | n/a |
$(-87.0)
(-1,017)
kWh
|
$(-4.0) |
$969
-
MMBtu
|
- | - |
| 02 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $1,244 | $525 | n/a |
$1,185
13,775
kWh
|
$59 | - | - | - |
| 03 | 2.7145: Install skylights | $1,332 | $4,380 | n/a |
$1,269
14,760
kWh
|
$63 | - | - | - |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $499 | - | n/a |
$475
5,524
kWh
|
$24 | - | - | - |
| 05 | 3.8121: Cover containers to minimize evaporative losses | $20,979 | $900 | n/a | - | - | - | $20,979 | - |
| 06 | 4.625: Develop standard operating procedures | $4,500 | $20,700 | n/a | - | - | - | - | $4,500 |
| TOTAL RECOMMENDED | $29,432 | $27,140 |
$2,842
33,042
kWh
|
$142 |
$969
-
MMBtu
|
$20,979 | $4,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs