Assessment Year | 2018 |
---|---|
Principal Product | Engineering Fabrication |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
160,000
ft2
|
Annual Production | 262,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $94,302 | 1,758,672 |
kWh
|
$0.054 | |
Electricity Demand | $38,899 | 6,210 |
kW-mo/yr
|
$6.26 | |
Electricity Fees | $4,889 | - |
|
- | |
Natural Gas | $69,765 | 12,921 |
MMBtu
|
$5.40 | |
Waste Disposal Costs | |||||
Water Usage | $4,034 | 540,000 |
Tgal
|
$0.007 | |
TOTAL YEARLY COSTS | $211,888 | ||||
RECOMMENDED SAVINGS* | $30,401 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $3,501 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,790 | - |
$2,790
52,652
kWh
|
- | - | - | |
02 | 2.4314: Use synthetic lubricant | $11,804 | - |
$7,192
135,694
kWh
|
$4,612
-
kW-mo/yr
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $519 | $200 | - | - |
$519
-
MMBtu
|
- | |
04 | 2.7134: Use photocell controls | $916 | $470 |
$916
17,280
kWh
|
- | - | - | |
05 | 2.7314: Reduce ventilation air | $660 | $925 |
$265
4,999
kWh
|
- |
$395
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $192 | $290 |
$44
824
kWh
|
$7
-
kW-mo/yr
|
- | $141 | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,625 | $4,006 |
$1,625
30,656
kWh
|
- | - | - | |
08 | 2.6211: Conserve energy by efficient use of vending machines | $167 | $412 |
$167
3,157
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,728 | $30,695 |
$7,429
140,172
kWh
|
$2,429
-
kW-mo/yr
|
- | $1,870 | |
TOTAL RECOMMENDED | $30,401 | $36,998 |
$20,428
385,434
kWh
|
$7,048
-
kW-mo/yr
|
$914
-
MMBtu
|
$2,011 | ||
TOTAL IMPLEMENTED | $3,501 | $490 |
$2,834
53,476
kWh
|
$7
-
kW-mo/yr
|
$519
-
MMBtu
|
$141 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs