ITAC Assessment: SU0444
ITAC logo
ITAC Assessment: SU0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Industrial Forging
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 30,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,184 678,882
kWh
Electricity Demand $44,900 3,633
kW-mo/yr
Electricity Fees $3,643 -
Fuel Oil #2 $91,263 6,893
MMBtu
TOTAL YEARLY COSTS $168,990
RECOMMENDED SAVINGS* $29,562 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,081 - - - $1,081
-
MMBtu
- -
02 2.7224: Reduce space conditioning during non-working hours $527 $439 - - $527
-
MMBtu
- -
03 3.1161: Eliminate/reduce an operation $1,675 $1,780 $(-58.0)
(-1,350)
kWh
$(-445.0)
-
kW-mo/yr
- $1,012 $1,166
04 2.7142: Utilize higher efficiency lamps and/or ballasts $145 $165 $53
1,227
kWh
$21
-
kW-mo/yr
- $41 $30
05 2.8114: Change rate schedules or other changes in utility service $25,853 $72,576 - - - - $25,853
06 2.4321: Upgrade obsolete equipment $162 $556 $116
2,716
kWh
$46
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $119 $563 $119
2,774
kWh
- - - -
TOTAL RECOMMENDED $29,562 $76,079 $230
5,367
kWh
$(-378.0)
-
kW-mo/yr
$1,608
-
MMBtu
$1,053 $27,049
TOTAL IMPLEMENTED $3,037 $2,899 $177
4,140
kWh
$(-399.0)
-
kW-mo/yr
$1,081
-
MMBtu
$1,012 $1,166
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs