ITAC Assessment: SU0430
ITAC logo
ITAC Assessment: SU0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Food and Beverage Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 113,000
ft2
Annual Production 4,000,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,989 11,334,861
kWh
Electricity Demand $468,627 26,319
kW-mo/yr
Electricity Fees $16,340 -
Natural Gas $28,404 3,970
MMBtu
TOTAL YEARLY COSTS $1,025,360
RECOMMENDED SAVINGS* $28,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $1,339 - - - - - $1,339
02 2.6231: Utilize controls to operate equipment only when needed $6,869 $471 $6,869
152,640
kWh
- - - -
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $4,295 $1,083 $4,295
95,433
kWh
- - - -
04 2.7314: Reduce ventilation air $1,938 $908 $379
8,423
kWh
- $1,559
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $1,737 $1,042 $1,737
38,608
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $244 $247 $110
2,453
kWh
$61
-
kW-mo/yr
- $43 $30
07 2.7142: Utilize higher efficiency lamps and/or ballasts $11,410 $14,021 $6,453
143,395
kWh
$4,380
-
kW-mo/yr
- $540 $37
08 2.7135: Install occupancy sensors $364 $431 $364
8,079
kWh
- - - -
09 2.6211: Conserve energy by efficient use of vending machines $197 $518 $197
4,387
kWh
- - - -
TOTAL RECOMMENDED $28,393 $18,721 $20,404
453,418
kWh
$4,441
-
kW-mo/yr
$1,559
-
MMBtu
$583 $1,406
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs