| Assessment Year | 2014 |
|---|---|
| Principal Product | CNC Tool Holders |
| NAICS | 333517: Machine Tool Manufacturing |
| SIC | 3541: Machine Tools, Metal Cutting Types |
| Sales Range | $10 M to 50M |
| # of Employees | 123 |
| Plant Area |
80,000
ft2
|
| Annual Production | 240,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $108,925 | 3,784,050 |
kWh
|
$0.029 |
| Electricity Demand | $38,460 | 7,497 |
kW-mo/yr
|
$5.13 |
| Natural Gas | $4,886 | 616 |
MMBtu
|
$7.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,160 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,080 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $1,507 | - | - | - |
$1,507
-
MMBtu
|
- | |
| 02 | 2.7135: Install occupancy sensors | $5,979 | $616 |
$5,979
207,604
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,770 | $2,000 |
$2,770
96,195
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $379 | $276 |
$68
2,365
kWh
|
$17
-
kW-mo/yr
|
- | $294 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,433 | $39,216 |
$11,908
413,472
kWh
|
$2,906
-
kW-mo/yr
|
- | $619 | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $931 | $2,604 |
$(-135.0)
(-4,680)
kWh
|
$(-92.0)
-
kW-mo/yr
|
$1,158
-
MMBtu
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $161 | $615 |
$161
5,573
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $27,160 | $45,327 |
$20,751
720,529
kWh
|
$2,831
-
kW-mo/yr
|
$2,665
-
MMBtu
|
$913 | ||
| TOTAL IMPLEMENTED | $4,080 | $4,880 |
$2,703
93,880
kWh
|
$(-75.0)
-
kW-mo/yr
|
$1,158
-
MMBtu
|
$294 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs