ITAC Assessment: SU0374
ITAC logo
ITAC Assessment: SU0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product CNC Tool Holders
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 123
Plant Area 80,000
ft2
Annual Production 240,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,925 3,784,050
kWh
Electricity Demand $38,460 7,497
kW-mo/yr
Natural Gas $4,886 616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $1,507 - - - $1,507
-
MMBtu
-
02 2.7135: Install occupancy sensors $5,979 $616 $5,979
207,604
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,770 $2,000 $2,770
96,195
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $379 $276 $68
2,365
kWh
$17
-
kW-mo/yr
- $294
05 2.7142: Utilize higher efficiency lamps and/or ballasts $15,433 $39,216 $11,908
413,472
kWh
$2,906
-
kW-mo/yr
- $619
06 2.7447: Install vinyl strip / high speed / air curtain doors $931 $2,604 $(-135.0)
(-4,680)
kWh
$(-92.0)
-
kW-mo/yr
$1,158
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $161 $615 $161
5,573
kWh
- - -
TOTAL RECOMMENDED $27,160 $45,327 $20,751
720,529
kWh
$2,831
-
kW-mo/yr
$2,665
-
MMBtu
$913
TOTAL IMPLEMENTED $4,080 $4,880 $2,703
93,880
kWh
$(-75.0)
-
kW-mo/yr
$1,158
-
MMBtu
$294
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs