ITAC Assessment: SU0341
ITAC logo
ITAC Assessment: SU0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Metal Stampings; Fabricated Parts
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 47
Plant Area 33,250
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 4,264
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,707 495,200
kWh
Electricity Demand $16,775 2,048
kW-mo/yr
Electricity Fees $3,711 -
Natural Gas $5,998 678
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,596

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $357 - - - $357
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $314 - $93
1,872
kWh
$221
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $299 - $299
5,992
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $31 - $31
613
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $626 $137 $626
12,513
kWh
- -
TOTAL RECOMMENDED $1,627 $137 $1,049
20,990
kWh
$221
-
kW-mo/yr
$357
-
MMBtu
TOTAL IMPLEMENTED $1,596 $137 $1,018
20,377
kWh
$221
-
kW-mo/yr
$357
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs