Assessment Year | 2012 |
---|---|
Principal Product | Ceramic Substrates and Filters used in Heavy Duty Diesel Engines |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 641 |
Plant Area |
550,000
ft2
|
Annual Production | 1,716,600
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $3,246,778 | 142,795,409 |
kWh
|
$0.023 |
Electricity Demand | $31,902 | 123,441 |
kW-mo/yr
|
$0.26 |
Electricity Fees | $23,530 | - |
|
- |
Natural Gas | $8,679,587 | 3,987,282 |
MMBtu
|
$2.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,890 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,741 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $46,347 | $5,200 |
$46,347
1,452,870
kWh
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $33,105 | $2,640 |
$33,105
1,037,766
kWh
|
- | - | - | - | |
03 | 3.1161: Eliminate/reduce an operation | $24,636 | $20,468 |
$(-72.0)
(-2,250)
kWh
|
$(-19.0)
-
kW-mo/yr
|
- | $5,125 | $19,602 | |
04 | 2.7314: Reduce ventilation air | $1,286 | $5,127 |
$104
3,252
kWh
|
- |
$1,182
-
MMBtu
|
- | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,516 | $10,889 |
$(-36.0)
(-1,118)
kWh
|
$(-4.0)
-
kW-mo/yr
|
$3,556
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $108,890 | $44,324 |
$79,448
2,490,520
kWh
|
$(-23.0)
-
kW-mo/yr
|
$4,738
-
MMBtu
|
$5,125 | $19,602 | ||
TOTAL IMPLEMENTED | $57,741 | $23,108 |
$33,033
1,035,516
kWh
|
$(-19.0)
-
kW-mo/yr
|
- | $5,125 | $19,602 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs