ITAC Assessment: SU0325
ITAC logo
ITAC Assessment: SU0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Ceramic Substrates and Filters used in Heavy Duty Diesel Engines
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 641
Plant Area 550,000
ft2
Annual Production 1,716,600
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,246,778 142,795,409
kWh
Electricity Demand $31,902 123,441
kW-mo/yr
Electricity Fees $23,530 -
Natural Gas $8,679,587 3,987,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,741

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $46,347 $5,200 $46,347
1,452,870
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,105 $2,640 $33,105
1,037,766
kWh
- - - -
03 3.1161: Eliminate/reduce an operation $24,636 $20,468 $(-72.0)
(-2,250)
kWh
$(-19.0)
-
kW-mo/yr
- $5,125 $19,602
04 2.7314: Reduce ventilation air $1,286 $5,127 $104
3,252
kWh
- $1,182
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $3,516 $10,889 $(-36.0)
(-1,118)
kWh
$(-4.0)
-
kW-mo/yr
$3,556
-
MMBtu
- -
TOTAL RECOMMENDED $108,890 $44,324 $79,448
2,490,520
kWh
$(-23.0)
-
kW-mo/yr
$4,738
-
MMBtu
$5,125 $19,602
TOTAL IMPLEMENTED $57,741 $23,108 $33,033
1,035,516
kWh
$(-19.0)
-
kW-mo/yr
- $5,125 $19,602
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs