ITAC Assessment: SU0313
ITAC logo
ITAC Assessment: SU0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Liquid Food and Beverage Products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 255,000
ft2
Annual Production 227,090,784
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $599,171 9,675,346
kWh
Electricity Demand $102,568 21,555
kW-mo/yr
Electricity Fees $36,977 -
Natural Gas $661,729 94,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $180,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,700 - $16,700
321,155
kWh
- - - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,535 - $2,535
46,384
kWh
- - - - - -
03 4.821: Pay bills on time to avoid late fees $1,460 - - - $1,460 - - - -
04 2.6231: Utilize controls to operate equipment only when needed $911 - $911
17,527
kWh
- - - - - -
05 2.4314: Use synthetic lubricant $256 - $163
3,136
kWh
$93
-
kW-mo/yr
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,350 $685 $6,350
101,120
kWh
- - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $473 $115 $305
5,869
kWh
$93
-
kW-mo/yr
- - $75 - -
08 2.4221: Install compressor air intakes in coolest locations $2,218 $1,072 $2,218
38,430
kWh
- - - - - -
09 2.7314: Reduce ventilation air $9,055 $10,481 $677
10,788
kWh
$125
-
kW-mo/yr
- $8,253
-
MMBtu
- - -
10 2.7122: Disconnect ballasts $1,569 $3,650 $756
14,545
kWh
$463
-
kW-mo/yr
- - $350 - -
11 2.6211: Conserve energy by efficient use of vending machines $477 $1,172 $477
8,143
kWh
- - - - - -
12 3.1161: Eliminate/reduce an operation $3,421 $12,720 - - - - - $3,421 -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $3,367 $12,355 $2,142
41,184
kWh
$1,225
-
kW-mo/yr
- - - - -
14 2.2414: Use waste heat from hot flue gases to preheat $6,727 $38,955 - - - $6,727
-
MMBtu
- - -
15 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $61,110 $1,000,000 - - - - - - $61,110
16 2.9121: Install wind powered electric generator $14,224 $153,902 $7,447
87,098
kWh
$6,777
-
kW-mo/yr
- - - - -
17 2.9114: Use solar heat to make electricty $49,554 $1,230,647 $21,981
308,279
kWh
$27,573
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $180,407 $2,465,754 $62,662
1,003,658
kWh
$36,349
-
kW-mo/yr
$1,460 $14,980
-
MMBtu
$425 $3,421 $61,110
TOTAL IMPLEMENTED $39,409 $64,830 $26,408
486,855
kWh
$1,318
-
kW-mo/yr
$1,460 $6,727
-
MMBtu
$75 $3,421 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings