ITAC Assessment: SU0261
ITAC logo
ITAC Assessment: SU0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Electronic Instrumentation
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $50
M
to 100
M
# of Employees 222
Plant Area 133,875
ft2
Annual Production 1,960
pieces
Production Hrs. Annual 3,060
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,678 3,563,455
kWh
Electricity Demand $68,249 7,454
kW-mo/yr
Electricity Fees $61,958 -
Natural Gas $63,891 55,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $16,451 - $16,451
228,480
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $403 - $321
4,459
kWh
$82
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $138 - $111
1,544
kWh
$27
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $125 - $61
842
kWh
$64
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $571 $249 $287
3,993
kWh
$284
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,455 $1,114 $492
6,833
kWh
$82
-
kW-mo/yr
$881
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,895 $7,860 $7,730
107,364
kWh
$165
-
kW-mo/yr
-
08 2.7314: Reduce ventilation air $12,057 $13,919 $11,837
164,406
kWh
$220
-
kW-mo/yr
-
09 2.6211: Conserve energy by efficient use of vending machines $354 $630 $354
4,917
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,800 $5,887 $2,690
37,350
kWh
$110
-
kW-mo/yr
-
11 2.4221: Install compressor air intakes in coolest locations $40 $153 $22
306
kWh
$18
-
kW-mo/yr
-
12 2.7135: Install occupancy sensors $368 $1,801 $368
5,110
kWh
- -
13 2.4322: Use or replace with energy efficient substitutes $18,169 $135,500 $15,422
214,200
kWh
$2,747
-
kW-mo/yr
-
TOTAL RECOMMENDED $60,826 $167,113 $56,146
779,804
kWh
$3,799
-
kW-mo/yr
$881
TOTAL IMPLEMENTED $60,472 $166,483 $55,792
774,887
kWh
$3,799
-
kW-mo/yr
$881
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs