ITAC Assessment: SU0223
ITAC logo
ITAC Assessment: SU0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Laminated & Coated Fabric
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,938 1,258,560
kWh
Electricity Demand $49,868 3,331
kW-mo/yr
Electricity Fees $7,292 -
Natural Gas $41,255 3,599
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,360 - $4,297
51,772
kWh
$1,063
-
kW-mo/yr
-
02 2.8114: Change rate schedules or other changes in utility service $5,040 - - - $5,040
03 2.4221: Install compressor air intakes in coolest locations $4,819 $357 $3,861
46,516
kWh
$958
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,353 $135 $1,083
13,052
kWh
$270
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $4,729 $3,850 $7,154
86,198
kWh
$(-2,425.0)
-
kW-mo/yr
-
06 2.6211: Conserve energy by efficient use of vending machines $219 $343 $174
2,102
kWh
$45
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $81 $258 $81
979
kWh
- -
TOTAL RECOMMENDED $21,601 $4,943 $16,650
200,619
kWh
$(-89.0)
-
kW-mo/yr
$5,040
TOTAL IMPLEMENTED $1,353 $135 $1,083
13,052
kWh
$270
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs