ITAC Assessment: IC0253
ITAC logo
ITAC Assessment: IC0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Caps
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 109
Plant Area 254,616
ft2
Annual Production 5,000,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,362,111 34,909,376
kWh
Electricity Demand $498,155 62,317
kW-mo/yr
Electricity Fees $369,245 -
Natural Gas $17,652 3,100
MMBtu
TOTAL YEARLY COSTS $2,247,163
RECOMMENDED SAVINGS* $112,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,199 $9,023 $6,462
148,561
kWh
$1,737
-
kW-mo/yr
02 2.2622: Replace existing chiller with high efficiency model $43,447 $8,510 $34,243
787,200
kWh
$9,204
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50 - $50
895
kWh
-
04 2.7241: Install outside air damper / economizer on hvac unit $39,245 $13,624 $30,935
711,150
kWh
$8,310
-
kW-mo/yr
05 2.2691: Shut off cooling if cold outside air will cool process $21,572 $7,624 $16,957
389,818
kWh
$4,615
-
kW-mo/yr
TOTAL RECOMMENDED $112,514 $38,781 $88,647
2,037,624
kWh
$23,866
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs