ITAC Assessment: SU0174
ITAC logo
ITAC Assessment: SU0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Ductile Iron
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 74
Plant Area 110,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,315 1,921,920
kWh
Electricity Demand $14,729 4,294
kW-mo/yr
Natural Gas $44,718 554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,923 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,108 - $3,673
61,219
kWh
$435
-
kW-mo/yr
- -
02 4.514: Re-arrange equipment layout to reduce handling costs $58,500 $16,260 - - - $58,500
03 2.4221: Install compressor air intakes in coolest locations $85 $45 $64
1,060
kWh
$21
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,102 $13,384 $12,703
211,723
kWh
$1,399
-
kW-mo/yr
- -
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $13,639 $14,240 - - $13,639
-
MMBtu
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,489 $10,360 - - $2,489
-
MMBtu
-
TOTAL RECOMMENDED $92,923 $54,289 $16,440
274,002
kWh
$1,855
-
kW-mo/yr
$16,128
-
MMBtu
$58,500
TOTAL IMPLEMENTED $92,923 $54,289 $16,440
274,002
kWh
$1,855
-
kW-mo/yr
$16,128
-
MMBtu
$58,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs