ITAC Assessment: SU0108
ITAC logo
ITAC Assessment: SU0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product 96000
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 140,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,420 3,325,866
kWh
Electricity Demand $87,993 8,048
kW-mo/yr
Electricity Fees $9,431 -
Natural Gas $37,996 5,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $7,892 $203 $7,597
151,940
kWh
$295
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $334 - $202
4,040
kWh
$132
-
kW-mo/yr
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $2,590 $22,825 - - $2,590
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,399 - $1,399
27,971
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $975 $158 $975
19,496
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $780 $81 $780
15,600
kWh
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $3,590 $7,000 $(-25.0)
(-494)
kWh
- $3,615
-
MMBtu
TOTAL RECOMMENDED $17,560 $30,267 $10,928
218,553
kWh
$427
-
kW-mo/yr
$6,205
-
MMBtu
TOTAL IMPLEMENTED $4,370 $7,081 $755
15,106
kWh
- $3,615
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs